Projects

Gas Main Manifold Replacement, NJ Transit

NV5 designed the relocation plan that involved the re-routing of two 24-inch diameter cast iron gas mains to avoid conflict with a proposed New Jersey Transit rail line and station.

NV5’s design included manifolding the two 24-inch mains to one 36-inch diameter steel main. Work included coordination with the NJ Transit construction manager. Our utility engineers prepared an EP-2 permit in accordance with “NJ Transit Rail Operations, Specifications for Pipeline Occupancy on NJ Transit Property.”

Work also included construction oversight of trenching, sheeting and shoring, bedding, and backfilling operations.

Facebooktwitterlinkedin