Pole Creek Detention Basin

NV5 provided ongoing public works inspection at Pole Creek over a two year period.

Pole Creek was a major detention basin project with demolition of existing channel and structures, building of the main reinforced concrete channel and structures, and development of a new low-flow bypass channel and reinforced concrete boxes, installation of a large 30-48″ underground storm drain system and structures, setting and removing numerous well points, soil cement manufacturing and placement, levee fill and basin excavation, contaminated soil removal, placement of grouted rip rap, asphalt paved service roads, chain link fencing, and National Pollutant Discharge Elimination System (NPDES) protection plan support as specified.

Location

Fillmore, CA

Client

County of Ventura

Services

Construction Observation