NV5 provided gas facility design services in conjunction with approximately 25,000 LF of roadway improvements along Routes 1 & 9 in Hudson County, New Jersey.
NV5 prepared multiple relocation schemes that were presented to NJDOT, as well as final plans, specifications, and a cost estimate. Due to the magnitude of the project, extensive design coordination meetings were required.
Design services included verification of existing facilities and evaluation of conflicts with proposed and existing drainage crossings. NV5 also prepared details, profiles, and staging plans. The final design documents were prepared in accordance with NJDOT Procedures Manual Chapter 10. Responsibilities included providing part-time construction oversight during trenching and pipe installation.