Projects
NV5 - Georgia Department of Transportation I-85 Widening

GDOT I-85 Widening

NV5 was responsible for roadway design to replace the two outside lanes and shoulders of I-85 in both directions with continuous reinforced concrete pavement. The median was paved, and a permanent concrete median barrier was added.

NV5 successfully met the tight deadline on this project.

Highlights of the project included concept development and coordination of staging options with the Georgia Department of Transportation (GDOT) and the Federal Highway Administration (FHWA), as well as a multitude of surface drainage calculations in association with paving the median. Plans included staging, erosion control, and signing and marking.