A new greenfield LNG peak-shaving facility was needed to provide pressure support to the distribution system in Washington State. The original facility included one 70,000 gallon storage tank and a 650 MSCFH vaporization system. This satellite LNG facility project included storage, vaporization, and truck unloading.
NV5 also provided design and management for a second 70,000 gallon LNG storage tank that was installed two years later.