Projects
NV5 - Innovation Way Interchange

Innovation Way Interchange at SR-528

This project consisted of construction plans for the interchange and extension of Alafaya Trail to Aerospace Boulevard with connection to International Corporate Park (ICP) Boulevard. The interchange includes a 4-ramp connection to SR 528. A new diamond interchange with a dual-lane loop ramp was proposed at the intersection of Innovation Way with SR 528.

This project also involved the abandonment of two existing ramps at the existing ICP Boulevard interchange and connected to a planned new roadway entrance to ICP from the west.

NV5 provided all aspects of horizontal and vertical design, plans production, primary and secondary drainage design, signing and pavement marking design, Water Management District permitting, quantity calculations, and sub-consultant and client coordination.

Facebooktwitterlinkedin

Location

Orlando, FL

Services

  • Highway Interchange Design
  • Drainage Design
  • Permitting, NEPA, & CEQA
  • Civil Program Management
  • Design & Topographic Survey Mapping

NV5 Projects