Commissioning Services for the construction of a new 81,935 SF elementary school for 450 students, grades PK through 3 on the site of the existing school.
Systems commissioned include: Rooftop Air Handling Units, Hot Water System, Miscellaneous fans, Decentralized HVAC equipment, hot water unit heaters, radiant heating panels, wall radiation units, fin tube radiation, ductless cooling units, variable refrigerant flow units, terminal equipment, variable air volume box, constant volume damper, condensate pumps, building automation system, domestic hot water system, sump pumps, lighting controls, normal power distribution, life safety systems, emergency & standby power systems, fire alarm systems, egress lighting system, security system, master clock system, public address system.
Project achieved LEED Silver Certification.