This project for Orange County, Florida, involved preliminary engineering, public involvement, final design, and construction plan preparation to upgrade the existing two-lane roadway to an urban four-lane roadway with a center turn lane.
This roadway project ran from Ivey Lane to the Orange Blossom Trail (OBT).