Tons of produce and perishable foods move through this distribution facility on a daily basis. NV5 performed a site feasibility analysis and had a lead role in the project entitlements for the redevelopment of this former Boeing facility. NV5 subsequently provided site civil design and surveying for a fully refrigerated facility.
- 300,000 cubic foot stormwater detention pond
- 20,000 lf of storm drainage pipe
- 50 acres of concrete pavement