Projects

Uxbridge High School

This project included development of a new site for which NV5 coordinated extensive environmental permitting. The solution allowed for reuse of the existing high school as a middle school.

NV5 worked closely with the town to prioritize and streamline space program requirements and with the architect to develop a compact and efficient plan, to ensure that all educational needs were met within the tight budget.

NV5 coordinated a comprehensive value engineering analysis to determine the most cost-effective approach for construction methods and materials, which allowed the preferred design to proceed within cost constraints. NV5 also developed and managed an aggressive schedule, which involved early-release bid packages to achieve the September opening date.


Facebooktwitterlinkedin

Location

Uxbridge, MA

Services

Owner’s Representation Services

Key Facts

  • 123,000 SF
  • Project Cost $45M