This upgrade project involved expansion of an existing 60 MMSCD shell and tube vaporization system with an additional 60 MMSCFD vaporizer. The project also included replacement of three 500-GPM LNG pumps to feed the 120 MMSCFD system.
This upgrade project involved expansion of an existing 60 MMSCD shell and tube vaporization system with an additional 60 MMSCFD vaporizer. The project also included replacement of three 500-GPM LNG pumps to feed the 120 MMSCFD system.