NV5 has provided materials testing for several of the City of Oxnard’s pavement rehab projects. The Wooley Road Arterial Resurfacing project entailed 160,000 SY of Asphalt Rubber Aggregate Membrane (ARAM), 19,000 tons of ARHM Overlay, and covered the area between Victoria Avenue and Rose Avenue.
NV5 provided asphalt batch plant inspection, field density testing, field sampling, and laboratory testing for ARAM and rubberized asphalt. Our services were provided on-time and within budget.