The resort and casino encompass 266,000 square feet of space with more than 48,000 square feet dedicated to gaming and 105 hotel rooms. The facility design includes 954 tons of chillers, 21,000 MBH heat capacity, and 110,000 cfm casino heat recovery air floor system.
[...]This project included the build-out of an additional 80,000 square feet of gaming floor space (adding approximately 1,800 slots), a 30,000 square foot luxury spa and fitness facility, and 30,000 square foot convention and meeting room space. In addition to the casino expansion, the project consisted of a 12-story, 297[...]
The Pearl Theater, located inside the Palms Casino Resort, was designed by Pfeiffer Partners with KGA Architects. This project features a 2,500-person capacity venue consisting of a three-tier, crescent-shaped cast-in-place concrete theater, with the main stage four feet from the floor, flanked by two 14×16 foot video screens. The farthest[...]
Argonne National Laboratory (ANL) relied on NV5 to review and analyze its radiation protection program; prepare, conduct, and document effectiveness reviews of the program; and prepare, conduct, and document management self-assessments. We then prepared a revised radiation protection program for Argonne in compliance with implementing regulations. We developed the radiological[...]
Located within ten miles of Fort Bragg and Pope Army Air Base in North Carolina, the Fayetteville VA Medical Center (VAMC) has been providing healthcare services for U.S. veterans since 1940. To address the growing demand for quality healthcare to those who have served our country, the U.S. Department of[...]
NV5 provided MEP/FP engineering for the design/build construction of a new ambulatory care center at UMass Medical Center. The 258,000 SF, nine-story facility collocates advanced medical education, clinical research, and ambulatory patient care programs in one building. These three program elements provide the environment necessary for the integration of clinical[...]
NV5 prepared a conceptual site model (CSM) to assess the sources and extent of a contaminant plume emanating from the landfill property. Using the results of the CMS, we then designed a perimeter cutoff trench dewatering system to prevent contamination of groundwater at the site. The cutoff trench will lower[...]
NV5 spearheaded the Advanced Water Purification Program’s education and outreach campaign to inform the community about Padre Dam’s water reuse project in East San Diego County. The award-winning public education and community outreach program includes an overview video, an animated video for families, speaker’s bureau, website, informational materials, and an[...]
Banner Taylor Reservoir formerly consisted of two lined covered reservoirs. The Nevada Irrigation District engaged NV5 to perform an investigation in preparation for the conversion of the two ponds into two 4.6-million-gallon, concrete, post-tensioned tanks. Based on our investigation, we provided foundation recommendations that would mitigate differential settlement of the[...]
Photo courtesy of Isgenuity. NV5 provided comprehensive mechanical, electrical, plumbing (MEP), fire protection, telecom, and electronic security system (ESS) design for an emergency department renovation/addition for Cape Cod Healthcare. The modernized and expanded facility has improved patient comfort and enhanced clinical treatment practices. Cape Cod Hospital’s Emergency Department is one[...]
Fill out the form below to download the handbook.
"*" indicates required fields
Please fill out the form below. After successful form submission, you will be redirected to the requested file. Thank you.
"*" indicates required fields
Our internal innovation and development team constantly analyzes new technology and develops solutions to meet our client’s challenges. Our Technically Speaking series is one way we share our technical findings with the professional community.Â
Please tell us a little about yourself by filling out the form below, and we’ll share the document with you, thanks!
Our internal innovation and development team constantly analyzes new technology and develops solutions to meet our client’s challenges. Our Technically Speaking series is one way we share our technical findings with the professional community.Â
Please tell us a little about yourself by filling out the form below, and we’ll share the document with you, thanks!
NV5 Geospatial releases a new predictive modeling platform for vegetation management that uses existing lidar and historical data to identify the relative level of asset risk from trees by quantifying the potential for causing asset damage.Â
Please tell us a little about yourself by filling out the form below, and we’ll share the document with you, thanks!
Our internal innovation and development team constantly analyzes new technology and develops solutions to meet our client’s challenges. Our Technically Speaking series is one way we share our technical findings with the professional community.Â
Please tell us a little about yourself by filling out the form below, and we’ll share the document with you, thanks!