The New York City Department of Transportation (NYCDOT) hired NV5 to plan the route of and prepare preliminary engineering design plans for a continuous 14-mile, mostly on-street, non-motorized greenway along Brooklyn’s East River and New York Harbor waterfront.
The route integrates physically separated trail facilities into existing street networks through the application of progressive “complete streets,” “green streets,” and sustainable stormwater management practices.