The South Carolina Department of Transportation hired NV5 to replace two deficient bridges along South Carolina Highway 5 (SC 5) in Lancaster and York Counties.
NV5 provided a number of services to complete this project, including surveying, subsurface utility engineering, planning, roadway and bridge design, hydraulic/drainage design, and permitting/environmental engineering.
A top priority bridge replacement project, we used a turnkey delivery approach and a compressed production schedule to successfully complete these projects on time.
The existing bridge over the Catawba River and CSX Railroad was replaced with a new 1,745-foot-long concrete structure. An existing overflow relief bridge also was replaced with a new 422-foot-long structure.