The “remodel” of the original FX Showroom within MGM Grand consisted of the complete demolition of all interior construction including the seating area floor. The stage trap floor was excavated for an additional story to house the new operable stage lift. KA is the second largest of the Cirque De[...]
The project consists of a 52-story high-rise tower with basement, a two-level podium with convention space, casino, restaurants, back-of-house, and a parking structure. Ground level contains back-of-house, parking, a new central plant, and a warehouse. The casino level has conference space, restaurants, nightclub, and gaming. The spa level includes back-of-house[...]
The new six-star luxury hotel, to be known as Crown Towers Perth, is underway. The expansion will include a 26-story tower with 500 rooms, as well as the following spaces: The Ground Level (7,912 sm/85,132 sq. ft.) includes the lobby; pool area; kitchen; bakery; and back-of-house space. Level 1 (19,134[...]
Design and construction of a new six story building for the ASU, Beus Center for Law and Society. NV5 audiovisual scope includes consulting and design of teaching spaces, conference rooms, public spaces, library, a video wall, digital signage, and room scheduling system. Our telecommunications scope includes consulting and design of[...]
NV5 provided commissioning services for a new state-of-the-art hospital which replaced an existing 150-year-old facility. The new two-story design includes bright and spacious living and treatment spaces, green areas, enclosed courtyards, 229 beds, auditorium, gymnasium, and commercial kitchen.
[...]When completed, the Northeast Cargo Center at O’Hare International Airport is expected to be the largest airside cargo development built in the last decade at a U.S. gateway airport. For Phase I, the first of three phases, the NV5 team is providing both commissioning and sustainable design consulting.
[...]This project involved removal from service of approximately 9.3-miles of 12-inch diameter pipeline and replacement and relocation of such pipeline with approximately 11.9-miles of 12-inch diameter pipeline on Texas Gas’ Slaughters-Montezuma system. The pipeline relocation and replacement was necessary due to a planned expansion of Bear Run Mine’s operations. NV5[...]
This project consists of two greenfield compressor stations. NV5 was responsible for wetland delineations, habitat assessments, agency consultation, permit application preparation, FERC environmental resource report preparation, and cultural resource surveys for this project. We also coordinated public and agency meetings.
[...]This project consists of approximately 30-miles of new pipeline (greenfield), as well as abandonment (by transfer and in-place) of several other pipelines in the area. NV5 was responsible for wetland delineations, habitat assessments, cultural resource surveys, agency consultation, permit application preparation, FERC pre-filing process management, FERC environmental resource report preparation,[...]
Fill out the form below to download the handbook.
"*" indicates required fields
Please fill out the form below. After successful form submission, you will be redirected to the requested file. Thank you.
"*" indicates required fields
Our internal innovation and development team constantly analyzes new technology and develops solutions to meet our client’s challenges. Our Technically Speaking series is one way we share our technical findings with the professional community.
Please tell us a little about yourself by filling out the form below, and we’ll share the document with you, thanks!
Our internal innovation and development team constantly analyzes new technology and develops solutions to meet our client’s challenges. Our Technically Speaking series is one way we share our technical findings with the professional community.
Please tell us a little about yourself by filling out the form below, and we’ll share the document with you, thanks!
NV5 Geospatial releases a new predictive modeling platform for vegetation management that uses existing lidar and historical data to identify the relative level of asset risk from trees by quantifying the potential for causing asset damage.
Please tell us a little about yourself by filling out the form below, and we’ll share the document with you, thanks!
Our internal innovation and development team constantly analyzes new technology and develops solutions to meet our client’s challenges. Our Technically Speaking series is one way we share our technical findings with the professional community.
Please tell us a little about yourself by filling out the form below, and we’ll share the document with you, thanks!