Search
Archives

Infrastructure

To address congestion, operational and safety issues, and local access limitations at Garden State Parkway Interchanges 41 (Jimmy Leeds Road) and 44 (Pomona Road), as well as to accommodate the planned widening of the Parkway, the New Jersey Transit Authority contracted with NV5 to provide preliminary and final design services[...]

To address needed capacity, enhance emergency evacuation, address safety/operational issues, and upgrade aging infrastructure, the NJ Turnpike Authority undertook a massive 50-mile widening program from milepost 30 to 80. Due to the size of the program and associated funding and schedule constraints, the Authority employed a multi-phase approach dividing the[...]

The Turnpike 6-9 Widening Program is the largest capital expansion program undertaken by the Authority since the construction of the New Jersey Turnpike back in the early 1950s. This $2.6B widening program provided for the construction of three-lane outer roadways (truck lanes) northbound and southbound from the southerly terminus with[...]

For the City of Waterbury, Connecticut, NV5 is providing conceptual through preliminary design services in support of a TIGER grant application to fund the construction of a 2.3-mile extension of the Naugatuck River Greenway. Final design is complete for Phase 1 from the Waterbury City Line north to Eagle Street.[...]

The New York City Department of Transportation (NYCDOT) hired NV5 to plan the route of and prepare preliminary engineering design plans for a continuous 14-mile, mostly on-street, non-motorized greenway along Brooklyn’s East River and New York Harbor waterfront. The route integrates physically separated trail facilities into existing street networks through[...]

With ever-increasing commercial development making traffic delays worse each year, Suffolk County sought to widen one of the busiest roads on the East End of Long Island — County Road 58 — from 3 to 5 lanes. However, early analyses projected costs that could exceed $40 million, with 2 years[...]

NV5 provided all soils, construction materials testing, and special inspection services on the new Oxnard Desalination Plant while working closely with management firms Kennedy/Jenks and Black & Veatch. Dubbed “GREAT” for Groundwater Recovery Enhancement and Treatment, the plant was designed to increase the city’s water supplies, particularly during droughts. The[...]

NV5 has provided ongoing wastewater engineering services at the City of Manteca Wastewater Quality Control Facility (WQCF). As part of this role, NV5 designed the Phase III facility expansion, which increased capacity from an average daily flow of 5 mgd to 10 mgd while improving effluent quality. Upgrade of the[...]

Fill out the form below to download the handbook.

Form #1 - Redirection to PDF

Form #2 - Sends email containing the link to the PDF

"*" indicates required fields

This field is for validation purposes and should be left unchanged.

eNewsletter - NV5 Real Estate Transaction Services

Contact NV5 Real Estate Transaction Services

Download NV5 2022 Compliance Calendar

Please fill out the form below. After successful form submission, you will be redirected to the requested file. Thank you.

"*" indicates required fields

This field is for validation purposes and should be left unchanged.
We are an equal opportunity employer. All applicants will be considered for employment without attention to race, color, religion, sex, sexual orientation, gender identity, national origin, veteran or disability status. We ensure nondiscrimination in all programs and activities in accordance with Title VI of the United States Civil Rights Act of 1964. If you need more information or special assistance for persons with disabilities or limited English proficiency, contact MaryJo OBrien at (954) 495-2112. Persons with hearing-and speech-impairments can contact the NV5 by using the Virginia Relay Service, a toll-free telecommunication device for the deaf (TDD). Call 711 for TTY/TDD.

Hyperspectral Imaging - Technically Speaking

Our internal innovation and development team constantly analyzes new technology and develops solutions to meet our client’s challenges. Our Technically Speaking series is one way we share our technical findings with the professional community. 

Please tell us a little about yourself by filling out the form below, and we’ll share the document with you, thanks!

Accuracy Part 1- Technically Speaking

Our internal innovation and development team constantly analyzes new technology and develops solutions to meet our client’s challenges. Our Technically Speaking series is one way we share our technical findings with the professional community. 

Please tell us a little about yourself by filling out the form below, and we’ll share the document with you, thanks!

Prune Optimization Webinar Recording

NV5 Geospatial releases a new predictive modeling platform for vegetation management that uses existing lidar and historical data to identify the relative level of asset risk from trees by quantifying the potential for causing asset damage. 

Please tell us a little about yourself by filling out the form below, and we’ll share the document with you, thanks!

Topobathy Lidar - Technically Speaking

Our internal innovation and development team constantly analyzes new technology and develops solutions to meet our client’s challenges. Our Technically Speaking series is one way we share our technical findings with the professional community. 

Please tell us a little about yourself by filling out the form below, and we’ll share the document with you, thanks!

Contact Geospatial

Contact Geospatial