The new Caleb Dustin Hunking School will be a co-located K-4 lower school and 5-8 upper school in the City of Haverhill. The new school will be built on the current ball fields of the existing Hunking School property. After construction of the new school, the old school will be[...]
NV5 managed the design and construction of a new 120,000 square foot recreational facility for UMass Amherst. The 3-story recreation center houses a gymnasium, indoor track, weight lifting & fitness areas, multi-purpose rooms, and administrative spaces. Constructed with an open floor plan, the recreation center offers visual connections throughout the[...]
The award winning Freeman-Kennedy School replaced the existing school, which was comprised of an original 2-story structure built in 1950 with 1-story additions built in 1954, 1964, and 1970 and created a new school serving grades 3 through 6. As the Owner’s Project Manager, NV5’s responsibilities included coordination with the[...]
NV5 provided full OPM services for the new Wilmington High School. The feasibility study resulted in the desired option that a completely new high school be constructed on the existing high school site. The new building was strategically located on site, resulting in a phasing plan that allowed for the[...]
NV5 served as project manager throughout all planning, design, and construction activities for the new home for the University’s School of Nursing. The project gutted an existing classical building, restored its shell, and re-structured it to meet current seismic requirements. This project provided completely new building systems (i.e., mechanical, electrical,[...]
University Hall comprises a new $133.5 million, 194,355 gross square feet academic building located on the site of a surface parking lot at the University of Massachusetts Boston. The new four-story building is intended to define and frame available water views and serve as the intersection of new pedestrian pathways.[...]
The new parking garage on the North Campus of UMass Lowell is located on a site abutting VFW Highway and adjacent to the Costello Gymnasium Building. The structure is an open-parking facility that provides parking for 627 vehicles. The superstructure system consists of pre-tensioned/pre-cast concrete double tee beams supported on[...]
NV5 managed the renovation of this 18,000 square foot mixed-use “incubator” space in Boston. The Venture Development Center is a startup incubator for technology and life science companies designed around flexibility, transparency, and collaboration. Work pods, offices and presentation rooms with leading edge technology provide direct views to Boston Harbor[...]
NV5 was retained as the Owner’s Project Manager for repairs to tsunami-related damages to guestrooms and restaurants at the five-diamond Four Seasons Resort Hualalai at Historic Kaʻupulehu. In order to reopen the resort within 6 weeks after the tsunami, the NV5 team worked extended hours 7 days per week.
[...]NV5 was hired as the Owner’s Scheduling Consultant for “The 9,” a residential and commercial complex in downtown Cleveland. The former Ameritrust complex was restored as a hotel, apartments, offices, and dining and entertainment venues. The Breuer Tower was renovated into a 156-room Metropolitan hotel affiliated with Marriott’s Autograph Collection,[...]
Fill out the form below to download the handbook.
"*" indicates required fields
Please fill out the form below. After successful form submission, you will be redirected to the requested file. Thank you.
"*" indicates required fields
Our internal innovation and development team constantly analyzes new technology and develops solutions to meet our client’s challenges. Our Technically Speaking series is one way we share our technical findings with the professional community.Â
Please tell us a little about yourself by filling out the form below, and we’ll share the document with you, thanks!
Our internal innovation and development team constantly analyzes new technology and develops solutions to meet our client’s challenges. Our Technically Speaking series is one way we share our technical findings with the professional community.Â
Please tell us a little about yourself by filling out the form below, and we’ll share the document with you, thanks!
NV5 Geospatial releases a new predictive modeling platform for vegetation management that uses existing lidar and historical data to identify the relative level of asset risk from trees by quantifying the potential for causing asset damage.Â
Please tell us a little about yourself by filling out the form below, and we’ll share the document with you, thanks!
Our internal innovation and development team constantly analyzes new technology and develops solutions to meet our client’s challenges. Our Technically Speaking series is one way we share our technical findings with the professional community.Â
Please tell us a little about yourself by filling out the form below, and we’ll share the document with you, thanks!