This natural gas storage project consists of approximately 17-miles of pipeline, 8 storage wells, and compression modification. NV5 performed wetland delineations, habitat assessments, agency consultation, permit application preparation, FERC environmental resource reports, and cultural resource surveys. We also coordinated public and agency meetings, provided environmental inspection and support for all[...]
This project involved removal from service of approximately 9.3-miles of 12-inch diameter pipeline and replacement and relocation of such pipeline with approximately 11.9-miles of 12-inch diameter pipeline on Texas Gas’ Slaughters-Montezuma system. The pipeline relocation and replacement was necessary due to a planned expansion of Bear Run Mine’s operations. NV5[...]
This project consists of two greenfield compressor stations. NV5 was responsible for wetland delineations, habitat assessments, agency consultation, permit application preparation, FERC environmental resource report preparation, and cultural resource surveys for this project. We also coordinated public and agency meetings.
[...]NV5 archaeologists assisted during renovations to the George Spangler Summer Kitchen in Gettysburg, Pennsylvania. Situated within the Gettysburg Military Park, the George Spangler farmstead served as a military hospital during the Civil War. Specific project tasks included removal of soil from the interior of the Summer Kitchen and monitoring backhoe[...]
NV5 developed a comprehensive environmental training program for the REX West and REX East projects totaling approximately 1,500 miles of pipeline. The program included training for all levels of personnel on the construction right-of-way and utilized a variety of media to train and test individuals. NV5 provided full time trainers[...]
NV5 was assigned as the Project Manager to perform or oversee various aspects of the project management including project costing, preparation of project schedule, providing project status updates, contracting strategy, Horizontal Directional Drill assessment, and construction contracting strategy. We also assisted in the solicitation of bids from environmental and right-of-way[...]
This project consists of approximately 30-miles of new pipeline (greenfield), as well as abandonment (by transfer and in-place) of several other pipelines in the area. NV5 was responsible for wetland delineations, habitat assessments, cultural resource surveys, agency consultation, permit application preparation, FERC pre-filing process management, FERC environmental resource report preparation,[...]
NV5 provided a complete construction inspection team for 2 miles of an 8-inch-diameter pipeline and meter station.
[...]NV5 provided forensic materials engineering services to evaluate various generations of reinforced concrete in the Rose Bowl Stadium. Testing services included: Concrete coring, sampling, and repair; concrete compressive strength testing; petrographic analysis; carbonation testing; chloride testing; reinforcing steel corrosion evaluation; and half-cell corrosion testing. The evaluation report summarized findings and[...]
The Miami International Airport People Mover (“MIA Mover”) is a light rail, 1.23 mile automated system that transports passengers and employees from Miami International Airport to the Miami Intermodal Center, an intermodal transportation hub that links the airport to rental car companies, Tri-rail, and Metrorail. The project included a 41,007-sq-ft[...]
Fill out the form below to download the handbook.
"*" indicates required fields
Please fill out the form below. After successful form submission, you will be redirected to the requested file. Thank you.
"*" indicates required fields
Our internal innovation and development team constantly analyzes new technology and develops solutions to meet our client’s challenges. Our Technically Speaking series is one way we share our technical findings with the professional community.Â
Please tell us a little about yourself by filling out the form below, and we’ll share the document with you, thanks!
Our internal innovation and development team constantly analyzes new technology and develops solutions to meet our client’s challenges. Our Technically Speaking series is one way we share our technical findings with the professional community.Â
Please tell us a little about yourself by filling out the form below, and we’ll share the document with you, thanks!
NV5 Geospatial releases a new predictive modeling platform for vegetation management that uses existing lidar and historical data to identify the relative level of asset risk from trees by quantifying the potential for causing asset damage.Â
Please tell us a little about yourself by filling out the form below, and we’ll share the document with you, thanks!
Our internal innovation and development team constantly analyzes new technology and develops solutions to meet our client’s challenges. Our Technically Speaking series is one way we share our technical findings with the professional community.Â
Please tell us a little about yourself by filling out the form below, and we’ll share the document with you, thanks!