NV5 is serving as Owner’s Project Manager for the planning, design, and construction phases of the utility corridor and roadway relocation project, a campus-wide utility corridor and roadway system for UMass-Boston. As part of the project, a reliable “looped” utility corridor will be constructed around the perimeter of the campus[...]
NV5 was commissioned to oversee the building of the new Central Heating Plant (CHP) located at the UMass-Amherst campus. The project includes a 38,000 square foot process building, a 27,000 square foot fuel oil and water tank farm, a 2,000 square foot condensate storage building, and new steam distribution utility[...]
NV5 provided Owner’s Project Management services on various projects at Vestas’ four plants in Colorado – blade and nacelle factories in Brighton, a blade factory in Windsor, and a tower factory in Pueblo. Vestas is one of the world’s largest wind-turbine makers. Some of the more notable projects include a[...]
HOLLYWOOD, FL — (Marketwired) — 05/28/15 — NV5 Holdings, Inc. (the “Company” or “NV5”) (NASDAQ: NVEE), a provider of professional and technical engineering and consulting solutions, today announced the closing of a $32.1 million underwritten public offering of 1,644,500 shares of its common stock, including 214,500 shares issued upon the[...]
The City of Boulder received a U.S. Department of Energy grant to move forward with a major plant modification to the 100-year old hydroelectric facility. NV5 worked directly with the City and Xcel Energy to manage the onsite construction and coordination of contractors, suppliers, and engineers. This included the decommissioning[...]
The Total Army School System (TASS) project consisted of a new three-story pentagon-shaped building with a center courtyard, tiered seating lecture hall, 265 individual “billet” sleeping quarter rooms, and administrative offices for the Michigan National Guard. NV5 performed an onsite due diligence investigation of reported non-conforming construction after the original[...]
This renovation and modification project included the complete demolition and renovation of the interiors of the Murphy Hall residence hall while preserving the Gothic architecture that is part of John Carroll University’s identity. Originally built in 1964, Murphy Hall is John Carroll University’s largest residence hall. In addition, two 8,000[...]
This project included a group of new residential buildings, a new 1,200 space parking garage, the relocation of athletic playing fields, and a new field house. The residential buildings included approximately 414,000 total sq. ft. of residential space and were built surrounding Case Western Reserve University’s new football/soccer field and[...]
The University of Massachusetts Amherst football program became a member of the Division I Football Bowl Subdivision of the National Collegiate Athletic Association (NCAA) and a member of the Mid-American Conference. Football games have been held at existing McGuirk Alumni Stadium for the past 45 years. However, the existing stadium[...]
The University Crossing Project at the University of Massachusetts Lowell is the symbolic “Campus Center” tying together the three campuses – North Campus, East Campus, and South Campus. This project achieved LEED Silver status. The facility, which functions as a student center, is situated on the site of the former[...]
Fill out the form below to download the handbook.
"*" indicates required fields
Please fill out the form below. After successful form submission, you will be redirected to the requested file. Thank you.
"*" indicates required fields
Our internal innovation and development team constantly analyzes new technology and develops solutions to meet our client’s challenges. Our Technically Speaking series is one way we share our technical findings with the professional community.
Please tell us a little about yourself by filling out the form below, and we’ll share the document with you, thanks!
Our internal innovation and development team constantly analyzes new technology and develops solutions to meet our client’s challenges. Our Technically Speaking series is one way we share our technical findings with the professional community.
Please tell us a little about yourself by filling out the form below, and we’ll share the document with you, thanks!
NV5 Geospatial releases a new predictive modeling platform for vegetation management that uses existing lidar and historical data to identify the relative level of asset risk from trees by quantifying the potential for causing asset damage.
Please tell us a little about yourself by filling out the form below, and we’ll share the document with you, thanks!
Our internal innovation and development team constantly analyzes new technology and develops solutions to meet our client’s challenges. Our Technically Speaking series is one way we share our technical findings with the professional community.
Please tell us a little about yourself by filling out the form below, and we’ll share the document with you, thanks!